Blog

  • Home  
  • Converter Bring-Up and tests

Converter Bring-Up and tests






Converter Bring-Up & Tests — Novertronics Technologies


Laboratory Validation

Converter Bring-Up &
Validation Testing


Professional Converter Testing Laboratory Setup

Safe & Reliable Start

We provide professional commissioning services that minimize the risk of component damage and accelerate the debugging cycle through proven methodology.

  • Systematic Subsystem Validation
  • Gate Signal & Timing Verification
  • High-Voltage Safety Protocols
  • Full Characterization Reporting

Validation Workflow

01

Inspection

Visual solder check and cold resistance measurements.

02

Aux Power

Testing housekeeping and logic sequencing.

03

Static Test

Low DC bus verification of PWM and dead-time.

04

Power-Up

Incremental voltage steps with real-time monitoring.

05

Characterization

Efficiency mapping and thermal hot-spot analysis.

06

Stress Test

Environmental cycling and full-load burn-in.

07

Certification

EMI/EMC pre-compliance and safety isolation.

08

Reporting

Full technical documentation and design fixes.

The Lab Suite

We utilize industry-leading measurement tools to ensure accuracy down to the millivolt and milliwatt.

1 GHz Scopes

High-speed waveform capture

WT5000

Precision power analysis

FLIR Thermal

0.02°C thermal resolution

1500V Sources

High-voltage DC power

EMI Receivers

Conducted noise screening

Grid Sims

3-phase AC validation

Concordia University Partnership

For high-power testing (>15kW), Novertronics has direct access to university-grade facilities, including three-phase grid simulators and high-power liquid-cooled load banks up to 100kW.

Validation Package

Report Deliverable Technical Value
Efficiency Curves Load vs. Efficiency mapping across full operating range.
Thermal Maps High-resolution IR imaging of semiconductors and magnetics.
Waveform Gallery High-speed gate, switching node, and transient captures.
Issue Log Documented design anomalies and root cause solutions.

Ready for Power-Up?

Consult with our lab engineers to schedule your converter validation project.

Schedule Testing